Talaea El Gaish tank waterproofing
Talaea El Gaish tank waterproofing covered the club’s settling tanks with hot-spray pure polyurea in 2020. Screed Contracting carried out the application; the official record does not name a city beyond the club.
Contractor Screed Contracting
Completed 2020
Website Krypton Chemical Solutions — Talaea El Gaish
Project overview
The official record says the settling tanks at Talaea El Gaish Club were lined with pure polyurea in 2020 by Screed Contracting. A basin lining remains under water, so it cannot be treated like a roof patch.
Scope of waterproofing works
- Place: Talaea El Gaish Club.
- Year: 2020.
- Scope: settling tanks.
- System: hot-spray pure polyurea.
- Applicator: Screed Contracting.
Krypton systems for this type of work
The official record names Polyurea Rayston, Krypton’s hot-spray pure polyurea. Its TDS reports watertightness at 5 bar / 50 m water column, a 4 s gel time at 25°C, a typical 1.5–2 mm film from 1.5–2.0 kg/m², 324% elongation and WRAS material approval 2208579. The full sheet also lists tensile strength 16.2 MPa, tear strength 69 N/mm, hardness 87A/35D and crack-bridging classes A5/B4.2.
Surface preparation decides the result
The TDS calls for mechanical preparation and crack repair first. Concrete moisture should be below 4%, support temperature 10–40°C and pull-off strength at least 1.4 N/mm². These are datasheet conditions, not published site-test results for this project.
Contractor: Screed Contracting. Completed: 2020. To discuss a similar project, contact Krypton Egypt.
Official project record: Talaea El Gaish settling tank waterproofing on kryptonchemicalsolutions.com.
Project gallery

Explore more Krypton Egypt projects.


No comment