District 5 roof waterproofing
District 5 roof waterproofing used a sprayed membrane, turned up at the walls to join the roof field and upstand. The official record gives no product grade, year or applicator.
Place District 5, New Cairo, Egypt
Scope Roof waterproofing
System Sprayed membrane; product grade not named
Website Krypton Chemical Solutions — District 5
Project overview
The official record describes District 5 as a large New Cairo district. It includes a mall, streets and low roofs around parking. Those roofs cover shops and back-of-house rooms. Leaks can affect public interiors.
The sprayed membrane crosses the roof and turns up the wall. This makes the deck-to-wall junction part of one continuous film. Krypton Chemical supplies resin systems for this work. The exact grade used at District 5 is not named, so it is not specified here.
Scope of waterproofing works
- Project: District 5.
- Place: New Cairo, Egypt.
- Scope: roof waterproofing.
- Membrane: sprayed and turned up at walls.
Krypton systems for this type of work
The official record describes a sprayed continuous membrane and a light-coloured finished roof. Product data such as temperature window, consumption and return-to-service time depend on the resin grade. The grade is not named, so no product TDS figures are applied to this project.
Surface preparation decides the result
The source says to remove dust, laitance and loose material. Cut out and fill cracks. The concrete or existing roof must be dry enough for the chosen resin. Complete wall details, outlets and penetrations before treating the open roof bay as finished.
To discuss a similar project, contact Krypton Egypt.
Official project record: District 5 roof waterproofing on kryptonchemicalsolutions.com.
Project gallery




Explore more Krypton Egypt projects.


No comment