About Project

Crews waterproofed Cairo Festival City in New Cairo through several campaigns. First, they applied hot-spray polyurea to roofs in 2018. In 2020, they sprayed foam on 3,000 m² of roofs. Next, they sealed structural joints with polyurea in 2021. They also added a continuous membrane to podium decks. The official record does not name an applicator.

Completed 2018, 2020 and 2021
Location Cairo Festival City, New Cairo
Website Krypton Chemical Solutions — Cairo Festival City

Project overview

Cairo Festival City is a busy New Cairo district with shops, offices and plazas. As a result, water that passes through a podium can reach shop ceilings, parking areas or plant rooms.

The work followed several phases. First, crews waterproofed roofs with hot-spray pure polyurea in 2018. Then, in 2020, they sprayed polyurethane foam on 3,000 m² of roofs. Next, they sealed structural joints with polyurea in 2021. Finally, they added a continuous membrane to the podium decks and carried it into drains and up the walls.

Scope of waterproofing works

  • Place: Cairo Festival City, New Cairo.
  • 2018: hot-spray pure polyurea on roofs.
  • 2020: sprayed polyurethane foam on 3,000 m² of roofs.
  • 2021: polyurea on structural joints.
  • Podium decks: continuous membrane carried into drains and up walls.

Krypton systems for this type of work

For the roofs and joints, the official record names Polyurea Rayston. Its data sheet lists a 4 s gel time at 25°C, typical film thickness of 1.5–2 mm, elongation of 324%, and tensile strength of 16.2 MPa. In addition, it reports tear strength of 69 N/mm.

These are product values, not site-test results. However, the source describes the 2020 foam as insulation, not as the waterproof layer. It does not name a foam grade.

By contrast, the source describes a continuous light-grey membrane on the podium. It runs into the drains and turns up at the wall. The record does not name a product for this membrane.

Surface preparation decides the result

The Polyurea Rayston data sheet calls for mechanical preparation and crack repair before application. It specifies pull-off strength of at least 1.4 N/mm², concrete moisture below 4%, and support temperature of 10–40°C. Therefore, these are product conditions, not published site-test results.

In addition, the record notes water in the podium cracks before work began. It says crews dried the deck and treated the cracks before applying the membrane.

Completed: 2018, 2020 and 2021. To discuss a similar project, contact Krypton Egypt.

Official project record: Cairo Festival City waterproofing on kryptonchemicalsolutions.com.

Project Gallery

Waterproofing membrane on the Cairo Festival City podium
Podium deck at Cairo Festival City with water in the cracks, before the finished membrane
Continuous membrane on the Cairo Festival City plaza