Crews waterproofed Cairo Festival City in New Cairo through several campaigns. First, they applied hot-spray polyurea to roofs in 2018. In 2020, they sprayed foam on 3,000 m² of roofs. Next, they sealed structural joints with polyurea in 2021. They also added a continuous membrane to podium decks. The official record does not name an applicator.
Completed 2018, 2020 and 2021
Location Cairo Festival City, New Cairo
Website Krypton Chemical Solutions — Cairo Festival City
Project overview
Cairo Festival City is a busy New Cairo district with shops, offices and plazas. As a result, water that passes through a podium can reach shop ceilings, parking areas or plant rooms.
The work followed several phases. First, crews waterproofed roofs with hot-spray pure polyurea in 2018. Then, in 2020, they sprayed polyurethane foam on 3,000 m² of roofs. Next, they sealed structural joints with polyurea in 2021. Finally, they added a continuous membrane to the podium decks and carried it into drains and up the walls.
Scope of waterproofing works
- Place: Cairo Festival City, New Cairo.
- 2018: hot-spray pure polyurea on roofs.
- 2020: sprayed polyurethane foam on 3,000 m² of roofs.
- 2021: polyurea on structural joints.
- Podium decks: continuous membrane carried into drains and up walls.
Krypton systems for this type of work
For the roofs and joints, the official record names Polyurea Rayston. Its data sheet lists a 4 s gel time at 25°C, typical film thickness of 1.5–2 mm, elongation of 324%, and tensile strength of 16.2 MPa. In addition, it reports tear strength of 69 N/mm.
These are product values, not site-test results. However, the source describes the 2020 foam as insulation, not as the waterproof layer. It does not name a foam grade.
By contrast, the source describes a continuous light-grey membrane on the podium. It runs into the drains and turns up at the wall. The record does not name a product for this membrane.
Surface preparation decides the result
The Polyurea Rayston data sheet calls for mechanical preparation and crack repair before application. It specifies pull-off strength of at least 1.4 N/mm², concrete moisture below 4%, and support temperature of 10–40°C. Therefore, these are product conditions, not published site-test results.
In addition, the record notes water in the podium cracks before work began. It says crews dried the deck and treated the cracks before applying the membrane.