Atomic Energy Authority roof waterproofing

Atomic Energy Authority roof waterproofing used hot-spray pure polyurea in 2021. The project covered an administration building. The official record does not name an applicator or precise site address.

Completed 2021
Website Krypton Chemical Solutions — Atomic Energy Authority

Project overview

The Authority’s administration building received a new roof membrane. The source gives no city or campus name. We do not add a more precise location.

Scope of waterproofing works

  • Place: Atomic Energy Authority administration building.
  • Year: 2021.
  • Scope: administration roof.
  • System: hot-spray pure polyurea.

Krypton systems for this type of work

The official record names Polyurea Rayston. It is Krypton’s hot-spray pure polyurea. The TDS gives a 4 s gel time at 25°C. A typical film is 1.5–2 mm from 1.5–2.0 kg/m². The product has 324% elongation and 16.2 MPa tensile strength. Sunlight may shift the colour of this aromatic resin while its mechanical strength remains. No topcoat is confirmed on this job.

Surface preparation decides the result

The TDS calls for mechanical preparation. Repair cracks first. Pull-off strength should reach at least 1.4 N/mm². Concrete moisture must stay below 4%. Support temperature should be 10–40°C. These are datasheet conditions, not published site-test results.

Completed: 2021. Contact Krypton Egypt to discuss a similar project.

Official project record: Atomic Energy Authority roof waterproofing on kryptonchemicalsolutions.com.

Project gallery

Illustrative image from the official project record: Atomic Energy Authority administration roof

Explore more Krypton Egypt projects.

No comment

Leave a Reply

Your email address will not be published. Required fields are marked *