About Project
Aeon Towers Mall of Arabia
• Wet areas and water features waterproofing using cold polyurea ,PU and epoxy flooring for parking.
Project overview
Aeon Towers is a MARAKEZ development at Mall of Arabia. The project needed two kinds of protection: waterproofing for wet areas and water features, where water is present every day or permanently, and a durable floor finish for the car park, which takes constant vehicle traffic, tyre abrasion and oil drips.
Scope of works
- Wet areas and water features: waterproofed with cold-applied polyurea and polyurethane (PU) membranes, which form a seamless, elastic layer that follows the shape of the substrate without heat or spray equipment.
- Parking: finished with an epoxy flooring system that seals the concrete and gives a hard-wearing, easy-to-clean surface.
Krypton systems for this type of work
Krypton’s cold-applied range includes Impermax Cold Polyurea, a two-component, self-levelling membrane with 600% elongation, applied by roller or spreader at up to 2 kg/m² in one coat. Among the polyurethane membranes, Impermax LY is a one-component PU with 402% elongation for balconies, terraces and wet areas. For car parks, Rayston Floor 1175 is a hard-wearing epoxy coating rated for garages and storage areas with medium traffic, with a slip-resistant finish available.
Why cold-applied membranes for wet areas?
Cold-applied systems can be laid in confined rooms and around details such as drains, pipes and upstands without spray rigs, while still giving a continuous membrane with no joints.
Getting the parking floor right
Epoxy car park floors start with a sound, dry, clean slab and a suitable primer. Rayston Floor 1200 is Krypton’s multipurpose epoxy used as a sealer or scratch coat, with or without quartz sand. On top of it, a high-build coating such as Rayston Floor 1175 gives a dust-proof, waterproof surface that is easy to clean and resists common chemicals and acids. Ramps and wet zones can receive an aggregate-textured finish for slip resistance.
Client: MARAKEZ. Contractor: TARGET. Completed: 27 June 2021. Planning a similar project? Talk to Krypton Egypt.