About Project

Cairo Airport roof waterproofing covered the Ministry of Aviation building and the Seasonal building in 2020 and 2021. El Fath Contracting applied hot-spray pure polyurea. Krypton Chemical makes the resin.

Contractor El Fath Contracting
Completed 2020 to 2021
Website Krypton Chemical Solutions — Cairo Airport

Project overview

Cairo International Airport is in Heliopolis. The work covered two buildings: the Ministry of Aviation building and the Seasonal building. The Seasonal building serves Hajj travel peaks, so reliable roof protection matters.

Scope of waterproofing works

  • Place: Cairo International Airport, Heliopolis.
  • Buildings: Ministry of Aviation building and Seasonal building.
  • Period: 2020 to 2021.
  • Work: roof waterproofing.
  • Membrane: Polyurea Rayston, hot-spray pure polyurea.
  • Application: El Fath Contracting.

Krypton systems for this type of work

The official record names Polyurea Rayston for both roofs. Its data sheet lists a 4 s gel time at 25°C, a typical film of 1.5–2 mm, elongation of 324%, and tensile strength of 16.2 MPa. It also reports watertightness at 5 bar and tear strength of 69 N/mm.

The data sheet lists a tack-free time of about 30 s at spraying temperature. These are product values, not timings measured on either airport building.

Surface preparation decides the result

The Polyurea Rayston data sheet calls for mechanical preparation and crack repair before application. It specifies pull-off strength of at least 1.4 N/mm², concrete moisture below 4%, and support temperature of 10–40°C. These are datasheet conditions, not published site-test results.

Contractor: El Fath Contracting. Completed: 2020 to 2021. To discuss a similar project, contact Krypton Egypt.

Official project record: Cairo Airport roof waterproofing on kryptonchemicalsolutions.com.