About Project

The Ramla waterproofing Egypt project used two systems on a coastal compound. Contractors lined the tanks and planter basins with hot-spray pure polyurea. They coated the roofs with two coats of Impermax, a liquid polyurethane. The official record does not state a year, city, area or applicator.

Place Ramla, a coastal compound in Egypt
Website Krypton Chemical Solutions — Ramla

Project overview

The record places Ramla on the coast, with sea views from the roofs. It describes the compound during construction, with flat roof decks, water tanks and planter basins cut into the slab.

Polyurea Rayston lines the tanks and planters that remain wet. Meanwhile, Impermax coats the roofs in two passes. The official record also says the tanks were filled and held for a water test.

Scope of waterproofing works

  • Place: Ramla, a coastal compound in Egypt.
  • Tanks and planter basins: Polyurea Rayston, hot-spray pure polyurea.
  • Roofs: Impermax liquid polyurethane, two coats.

Krypton systems for this type of work

Polyurea Rayston lines the tanks and planter basins. Its data sheet reports watertightness at 5 bar / 50 m water column, liquid water permeability of 0.002 kg/m²·h0.5, and a 4 s gel time at 25°C. A typical film is 1.5–2 mm. The data sheet also lists 324% elongation and WRAS material approval 2208579.

Impermax coats the roofs. This one-component liquid polyurethane can be rolled, brushed or sprayed cold. The data sheet calls for two coats of about 1 kg/m² each. It reports 450–600% elongation and tensile strength of 2.5–4.3 MPa. These are product values, not site-test results.

Surface preparation decides the result

The Polyurea Rayston data sheet calls for mechanical preparation and crack repair before application. It specifies pull-off strength of at least 1.4 N/mm², concrete moisture below 4%, and support temperature of 10–40°C.

For Impermax, the record calls for a clean, dry deck at 5–40°C. It recommends two coats. People can usually walk on the surface after one or two days. However, water testing should wait 10–15 days. These are product conditions, not published site-test results.

To discuss a similar project, contact Krypton Egypt.

Official project record: Ramla waterproofing on kryptonchemicalsolutions.com.

Project Gallery

Roof decks of the Ramla compound on the coast
Lined water tanks at Ramla during a water test
Water test in a lined tank at Ramla
Polyurea lining around a tank outlet at Ramla