Movenpick October roof waterproofing
Movenpick October roof waterproofing used hot-spray pure polyurea on the hotel roof in 6th of October City in 2021. The official record does not name an applicator.
Completed 2021
Website Krypton Chemical Solutions — Movenpick October
Project overview
The official record states that the roof of the Movenpick in 6th of October City was waterproofed with hot-spray pure polyurea in 2021. A hotel roof covers occupied rooms and service areas; leaks can reach guest spaces, not only plant rooms.
Scope of waterproofing works
- Place: Movenpick Hotel, 6th of October City.
- Year: 2021.
- Scope: roofs.
- System: hot-spray pure polyurea.
Krypton systems for this type of work
The official record names Polyurea Rayston, Krypton’s hot-spray pure polyurea. Its TDS reports a 4 s gel time at 25°C, a typical 1.5–2 mm film from 1.5–2.0 kg/m², 324% elongation and tensile strength 16.2 MPa. The aromatic resin may change colour in sunlight while mechanical strength remains. An aliphatic topcoat is not confirmed on this job unless the source names it.
Surface preparation decides the result
The TDS calls for mechanical preparation and crack repair first, pull-off at least 1.4 N/mm², concrete moisture below 4% and support temperature 10–40°C. These are datasheet conditions, not published site-test results for this project.
Completed: 2021. To discuss a similar project, contact Krypton Egypt.
Official project record: Movenpick October roof waterproofing on kryptonchemicalsolutions.com.
Project gallery



Explore more Krypton Egypt projects.


No comment