GUPCO Ras Shukeir tank waterproofing
GUPCO Ras Shukeir tank waterproofing lined water tanks at GUPCO’s terminal on the Gulf of Suez in 2020. Core, Hassan Allam Sons, held the contract.
Client GUPCO
Contractor Core, Hassan Allam Sons
Completed 2020
Website Krypton Chemical Solutions — GUPCO Ras Shukeir
Project overview
The official record describes Ras Shukeir as GUPCO’s town on the Gulf of Suez, an oil terminal where fresh water is brought, stored and guarded. Tanks there are working equipment, not architecture. In 2020 those concrete tanks were lined with polyurea.
Scope of waterproofing works
- Place: Ras Shukeir, Gulf of Suez.
- Client: GUPCO.
- Year: 2020.
- System: polyurea.
- Contractor: Core, Hassan Allam Sons.
- Scope: water tanks.
Krypton systems for this type of work
The official project record names the lining as Polyurea Rayston, Krypton’s hot-spray pure polyurea. Its TDS reports watertightness at 5 bar / 50 m water column (EN 12390-8), liquid water permeability 0.002 kg/m²·h0.5 (EN 1062-3:2008), gel time 4 s at 25°C, a typical 1.5–2 mm film from 1.5–2.0 kg/m², and 324% elongation. It also has WRAS material approval 2208579.
The full TDS lists a 4 s gel time for a 20 g A+B mix at 25°C and 3 s at 60°C. Tack-free time is 30 s at 70°C. Typical use is 1.5–2.0 kg/m² for a 1.5–2 mm film. It reports maximum elongation 324%, tensile strength 16.2 MPa (EN ISO 527-1/3), tear strength 69 N/mm (ISO 34-1 method B), hardness 87A/35D (ISO 868), water permeability 0.002 kg/m²·h0.5, and watertightness at 5 bar / 50 m. It also lists static crack bridging A5 at −10°C, dynamic class B4.2 at 23°C and −20°C, impact strength 24.5 N·m (class III), adhesion to epoxy-primed concrete 4.0 MPa, substrate pull-off at least 1.4 N/mm², and moisture below 4%. Certifications include CE to EN 1504-2 (0370-CPR-2247), ETA 16/0148, and WRAS 2208579.
Surface preparation decides the result
Where the official record discusses application, it follows the Polyurea Rayston TDS. Prepare the surface mechanically and repair cracks first. Pull-off strength should reach at least 1.4 N/mm², concrete moisture must stay below 4%, and support temperature should be 10–40°C. These are datasheet conditions, not published site-test results for this job.
Client: GUPCO. Contractor: Core, Hassan Allam Sons. Completed: 2020. To discuss a similar project, contact Krypton Egypt.
Official project record: GUPCO Ras Shukeir waterproofing on kryptonchemicalsolutions.com.
Project gallery

Explore more Krypton Egypt projects.