About Project

In 2021, Khalda Petroleum waterproofed its Abu Gharadig concession. First, ETS sprayed polyurea over the tiled roofs. The team also placed prefabricated polyurea sheets in an evaporation pond. Finally, ETS applied polyurethane foam with an acrylic finish to the villa roofs.

Client Khalda Petroleum
Contractor ETS (Engineering Co. for Trade and Supplies)
Completed 2021
Website Krypton Chemical Solutions — Khalda Petroleum

Project overview

Abu Gharadig lies in Egypt’s Western Desert. In this oil concession, the sun is severe, and water is stored, not wasted. As a result, Khalda Petroleum needed to keep the contents of its roofs, villas and evaporation pond in place.

Specifically, the 2021 works used a different build-up for each exposure. Spray polyurea covered tiled roofs of 10,000 m² and 8,000 m². In addition, prefabricated polyurea sheets lined an 8,000 m² evaporation pond. Meanwhile, polyurethane foam with an acrylic finish covered 15,000 m² of villa roofs. Official project photo captions also identify foam spray at the Razzak field. They also show polyurea on a tiled roof at Tariq Gas Field. The source does not name a specific foam or sheet grade.

Scope of waterproofing works

  • Place: Khalda concession, Abu Gharadig, Western Desert.
  • Client: Khalda Petroleum.
  • Year: 2021.
  • Roofs over tiles: 10,000 m² and 8,000 m².
  • Villa roofs: 15,000 m².
  • Evaporation pond: 8,000 m².
  • Applicator: ETS.

Krypton systems for this type of work

The official page describes spray polyurea on the tiled roofs. It also shows sheet polyurea lining the pond. For the villas, foam plus acrylic provides insulation and a reflective skin. In this case, spray polyurea forms the key waterproofing layer on the roofs and the pond. The application notes name Polyurea Rayston as the spray product. According to its TDS, gel time is 4 s at 25°C. A typical 1.5–2 mm film uses 1.5–2.0 kg/m². It has 324% elongation and 16.2 MPa tensile strength (EN ISO 527-1/3). However, the source gives no official grade names for the foam and prefabricated sheets, so they remain unnamed here.

Surface preparation decides the result

For sprayed polyurea, the official record follows the Polyurea Rayston TDS. The surface must be flat, compact and cohesive. Pull-off strength must reach at least 1.4 N/mm², and cracks should be repaired first. Additionally, concrete moisture must stay under 4%. The support temperature should be between 10 and 40°C, while air humidity should remain under 85%. These are datasheet conditions, not site test results published for this job.

Client: Khalda Petroleum. Contractor: ETS (Engineering Co. for Trade and Supplies). Completed: 2021. To discuss a similar project, contact Krypton Egypt.

Official project record: Khalda Petroleum waterproofing on kryptonchemicalsolutions.com.

Project gallery

Official project caption: Krypton polyurea hot-spray on a tiled roof at Tariq Gas Field
Krypton polyurea hot-spray application on a tiled plant roof at Khalda Petroleum
Finished Krypton polyurea coating on a tiled plant roof at Khalda Petroleum
Krypton polyurea evaporation pond lining being laid at the Khalda concession
Close-up of Krypton polyurea sheets on the evaporation pond liner at Khalda Petroleum
Official project caption: Krypton polyurethane foam spray on a roof at the Razzak field
Krypton polyurea coating on a foam-coated corrugated roof at the Khalda site
Rayston Krypton polyurea pails on a foam-coated corrugated roof on site at Khalda Petroleum
A Krypton Chemical polyurea pail during coating of a corrugated foam roof at Khalda Petroleum